myRiskALERT – presentation request

Modules Functionality – “Engineering Input”

Professional judgement may need to be exercised in order to come to a decision on whether a safety action is a result of a risk that can be considered as a major HSE risk and will be transferred to Risk Register for further mitigation.

Setting-up the correct links in Risk-Track through relevant actions from Action Tracking Register to Risk Register in order to support the claims for each control developed during various project phases will require engineering input and assessment.

Action Tracking Register can also be used for the following up process for mitigation actions identified in project risk management. In this way the system can be a veritable instrument for project and risk managers in the monitoring and controlling phase.

Modules

ACTION TRACKER REGISTER – used for tracking action items resulted from:

  • Design Review (including 3D Model Review);
  • Hazard Identification;
  • Simultaneous Operations Study;
  • Case Specific Risk Assessment ;
  • Safety Operation Study;
  • Control System Hazards and Operability Study;
  • Constructability Reviews;
  • Procedures/Plan/Readiness Review;
  • Operation Safety Readiness Review.
RISK REGISTER – used for record, monitor and rank the risks identified in:

  • Risk Identification;
  • Risk Breakdown Structure;
  • Risk Register;
  • Risk Workshops;
  • Risk Analysis;
    • Qualitative Risk Analysis
    • Quantitative Risk Analysis
  • Risk Evaluation;
  • Risk Monitoring and Review.

Presentation request about of the myRiskALERT Application